A capacity mechanism is a design problem

Paying plant to be available sounds like common sense. Almost every word in that sentence is a choice.

Sample. This piece is a placeholder for the layout. It is not reporting, and it does not quote or cite figures from any person or institution.

Paying someone to be available is a sentence most people can agree with, right up to the moment they have to write the instrument. An energy-only market pays for energy that was produced. A capacity mechanism pays for the ability to produce, or to reduce demand, when the system calls. Governments reach for the second instrument when they do not trust the first to keep the scarce hours covered. That instinct is intelligible. It is not yet a design.

The design is the policy. A mechanism that cannot say what “available” means will pay for a word.

Unpacking one sentence

Take the slogan apart.

Available when. A plant that can run all afternoon is a different product from a plant that can run for eight hours after sunset, which is a different product from a battery that can cover one sharp peak. If the mechanism pays all three the same, it has decided, silently, that duration does not matter. Duration is often the thing that matters.

Available to whom, and on what notice. A unit that needs a day to start cannot cover a contingency this hour. A demand-response portfolio that can drop load in minutes cannot, by itself, cover a week of still weather. The notice period and the length of the call are the product. Leave them vague and the payment buys a brochure.

Measured how. Availability can mean a test, a historical performance, a fuel stockpile, a state of charge, or a contractual promise with a penalty. Each measure can be gamed, and each misses something. A test on a mild afternoon says little about a stressed evening. A penalty so small that it is cheaper to fail than to fuel is not a penalty. The measurement is where the mechanism either becomes real or becomes a transfer.

Paid by whom. The cost lands somewhere: on customers as a levy, on the demand side of the market, on the budget. A payment that is invisible on the bill has not become free. It has become harder to argue about. A payment that is visible will be attacked as a subsidy for whatever technology the critic already disliked. Both reactions are political. The design still has to name the payer.

Who may qualify. A mechanism drawn around the shape of a thermal generator will struggle to see a battery, a household fleet, or an industrial load that can stop. A mechanism that is “technology neutral” in the press release and generator-shaped in the eligibility rules is not neutral. Neutrality is a property of the tests, not of the adjective.

What it does to the energy market

A capacity payment sits beside an energy market, and the two can help each other or double up. If the energy market already pays enough, in the scarce hours, for the plant that keeps those hours covered, a capacity payment on top is a second fee for the same service. If the energy market is capped, or politically unable to let scarce hours be expensive, then some form of availability payment may be how that plant stays in the system at all. Those are different problems. They are often described as one reform.

There is a related mistake: using the mechanism to pick winners that the eligibility rules were not honest about. If the public wants a particular technology for reasons of industry, emissions, or regional employment, that is a legitimate argument to have in the open. Hiding it inside a reliability payment means the reliability case is never tested, and the industrial case is never costed. A design can serve more than one objective. It should not pretend the second objective is the first.

Storage and demand response make the pretence harder to maintain, which is useful. They do not look like a power station. A mechanism that can procure them has to say what service it actually wants — energy for a number of hours, response in a number of minutes, a guaranteed reduction at the peak — rather than “a power station, but perhaps also other things.” The moment the service is specified, a great deal of slogan-work collapses, and the comparison between options becomes possible.

Specification, not team

The argument worth having is not for or against “a capacity mechanism” as a badge. Almost any government worried about scarce hours will reach for a payment for availability, under one name or another. The argument is about the specification: the hours, the duration, the penalty for not showing up, the payer, and whether the door is open to whoever can provide the service or only to whoever looks like the last power station.

A proposal that cannot fill in those blanks is not ready to be costed, and it is not ready to be cheered. Common sense got the sentence written. It will not mark the exam.